Bitumen Calculator (Quantity)
Estimate total bitumen required from area, spray rate, and waste allowance for paving and surface treatment work.
Open calculatorWork out how much bitumen and aggregate you need for asphalt paving, how much binder to order for tack, prime and seal coats, and how many drums that makes. Enter your measurements, pick your units and see the result instantly.
Work out bitumen, aggregate and cost for asphalt paving, spray applications and drum conversions. Results update as you type.
Cost (optional)
Estimates only. Confirm quantities against your approved mix design and project specification before ordering.
Estimates only. Confirm quantities against your approved mix design and project specification before ordering.
Estimates only. Confirm quantities against your approved mix design and project specification before ordering.
Choose the tab that matches your job, enter your measurements and pick the unit next to each value. The result updates as you type.
Bitumen (kg) = Length (m) × Width (m) × Thickness (m) × Mix density (kg/m³) × Bitumen % ÷ 100
Use your approved mix design for density and bitumen content. The mix type presets are typical figures for planning.
A road section is 800 m long and 7 m wide, with a 40 mm wearing course. The mix density is 2,350 kg/m³ and the bitumen content is 5.5%.
Thickness is converted to metres first (40 mm is 0.04 m). The calculator does the same for feet, yards, centimetres, inches and pounds per cubic foot. These are the values loaded when the page opens, so you can compare them with the result above.
These are the formulas the calculator uses. All lengths are in metres and all weights in kilograms unless stated.
| What you want | Formula | Notes |
|---|---|---|
| Mix volume | V = L × W × T | Gives cubic metres (m³). |
| Mix weight | W = V × ρ | ρ is the compacted mix density, usually 2,300 to 2,450 kg/m³. |
| Bitumen weight | Wb = W × B% ÷ 100 | B% is the bitumen content by weight of mix. |
| Bitumen content | B% = Wb ÷ W × 100 | Use this when you know both weights. |
| Spray quantity | Q = Area × Rate × (1 + Waste% ÷ 100) | Rate is in kg/m² or L/m². |
| Litres from kilograms | L = kg ÷ density | Bitumen is about 1.03 kg/L. |
Hot mix asphalt is usually 4 to 7% bitumen by weight. The rest is crushed aggregate, sand and filler. At 5.5%, one tonne of mix holds 55 kg of bitumen. Too little binder can lead to cracking and loose surface stones, and too much can lead to bleeding and rutting, so the final figure comes from your mix design.
| Mix type | Bitumen content | Typical use |
|---|---|---|
| Wearing course, dense graded | 5.0 to 6.0% | Surface layer of most roads |
| Binder course | 4.5 to 5.2% | Layer under the wearing course |
| Base course | 3.8 to 4.8% | Structural layer on the road base |
| Stone mastic asphalt (SMA) | 5.8 to 7.0% | Heavy traffic roads |
| Open graded friction course | 4.5 to 6.0% | Drainage and low noise surfaces |
These are typical planning ranges. Aggregate type, grading, traffic and climate all change the figure, so use the value from your Marshall or Superpave mix design.
| Bitumen content | Bitumen in 1 tonne of mix | Mix made from 1 tonne of bitumen |
|---|---|---|
| 4.0% | 40 kg | 25.0 t |
| 4.5% | 45 kg | 22.2 t |
| 5.0% | 50 kg | 20.0 t |
| 5.5% | 55 kg | 18.2 t |
| 6.0% | 60 kg | 16.7 t |
| 6.5% | 65 kg | 15.4 t |
| 7.0% | 70 kg | 14.3 t |
These figures use a mix density of 2,350 kg/m³, 5.5% bitumen and a drum net weight of 180 kg. Change the inputs in the calculator above to match your own project.
| Section (1 km long) | Mix (tonnes) | Bitumen at 5.5% (tonnes) | Drums at 180 kg |
|---|---|---|---|
| 3.5 m wide, 40 mm thick (one lane) | 329.0 | 18.10 | 101 |
| 3.5 m wide, 50 mm thick (one lane) | 411.3 | 22.62 | 126 |
| 7 m wide, 40 mm thick (two lanes) | 658.0 | 36.19 | 201 |
| 7 m wide, 50 mm thick (two lanes) | 822.5 | 45.24 | 251 |
| 7 m wide, 60 mm thick (two lanes) | 987.0 | 54.29 | 302 |
Spray rates are given in litres or kilograms per square metre. Multiply the treated area by the rate and add a waste allowance. For 5,000 m² at 0.35 L/m² with 5% waste you need 1,837.5 litres, which is about 1,893 kg at 1.03 kg/L.
| Treatment | Typical rate | Binder |
|---|---|---|
| Tack coat | 0.25 to 0.50 L/m² | Bitumen emulsion |
| Prime coat | 0.70 to 1.40 L/m² | Cutback bitumen or prime emulsion |
| Seal coat or surface dressing | 0.90 to 1.60 L/m² | Emulsion or hot bitumen binder |
Rates change with the surface texture and your specification. Use the spray rate calculator to check the rate you applied, or read the spray rate guide. To convert between kilograms and litres, see the bitumen density calculator.
Each calculator below has its own page with the formula, a worked example and answers to common questions.
Estimate total bitumen required from area, spray rate, and waste allowance for paving and surface treatment work.
Open calculatorCalculate bitumen volume from length, width, and thickness for trenching, lining, or rectangular application zones.
Open calculatorDetermine bitumen density from mass and volume to support material checks, conversions, and technical reporting.
Open calculatorWork out actual spray rate from applied bitumen quantity and covered area for surface treatment verification.
Open calculatorEstimate roofing bitumen or coating volume from roof area, number of coats, and product coverage rate.
Open calculatorCalculate binder mass from total mix mass and optimum bitumen content percentage for asphalt mix design and lab planning.
Open calculatorPractical guides on estimating bitumen quantities, choosing spray rates and converting density, volume and weight.
A practical guide for estimating tack coat, prime coat, seal coat, and surface treatment quantities using area, spray rate, and waste allowance.
Read articleLearn how to compare planned and actual spray rate values so field application stays closer to project targets.
Read articleUnderstand the relationship between density, volume, and mass for better conversions, checks, and material planning.
Read articleA bitumen calculator estimates how much bitumen binder a job needs. For asphalt it multiplies the layer volume by the mix density and the bitumen content. For spraying it multiplies the treated area by the spray rate.
Multiply length, width and compacted thickness (all in metres) to get the volume. Multiply by the mix density to get the mix weight, then multiply by the bitumen percentage divided by 100. For 224 m³ at 2,350 kg/m³ and 5.5% bitumen, that gives 28.95 tonnes.
At the usual 4.5 to 6.5% content, one tonne of asphalt holds about 45 to 65 kg of bitumen. At 5.5% it holds 55 kg.
It depends on the work. Spraying at 1.2 kg/m² needs 1,200 kg. Paving a 40 mm layer at 2,350 kg/m³ and 5.5% bitumen needs about 5.17 tonnes.
Bitumen content (%) = weight of bitumen ÷ total mix weight × 100. For example, 22.6 tonnes of bitumen in 411 tonnes of mix is 5.5%.
Bitumen is the black, sticky binder made from crude oil. Asphalt is the paving material made by mixing bitumen with aggregate such as crushed stone, sand and filler.
With a net weight of 180 kg per drum, one tonne is about 5.6 drums. Drum weights vary by supplier, so enter your own figure in the Drums & litres tab.
Compacted dense asphalt is typically 2,300 to 2,450 kg/m³. Use the density from your mix design or core tests when you have it.
Use Asphalt mix for paving layers, Spray rate for tack, prime and seal coats, and Drums & litres for conversions. The other calculators on this site cover volume, density, roofing and optimum bitumen content.
They are planning estimates based on the values you enter. Final orders should follow your approved mix design, product specifications and site conditions.
Yes. It is built for phones, tablets and desktops, so you can use it on site.
Visit the dedicated calculator pages for volume, density, spray rate, roofing quantities, and optimum bitumen content.