Free, no sign-up

Free Bitumen Calculator for Road Construction

Work out how much bitumen and aggregate you need for asphalt paving, how much binder to order for tack, prime and seal coats, and how many drums that makes. Enter your measurements, pick your units and see the result instantly.

Metric and imperial
Metres, feet, yards, mm, inches, kg/m³ and lb/ft³.
Shows the working
Every step is listed so you can check it.
Cost in your currency
USD, PKR, INR, AED, SAR and more.
Copy, print or share
Send the result or a link to your team.

Bitumen Calculator

Work out bitumen, aggregate and cost for asphalt paving, spray applications and drum conversions. Results update as you type.

Typical values for planning. Use your approved mix design for orders.
%
%

Cost (optional)

Bitumen required — tonnes

Show the working

    Estimates only. Confirm quantities against your approved mix design and project specification before ordering.

    How to use the bitumen calculator

    Choose the tab that matches your job, enter your measurements and pick the unit next to each value. The result updates as you type.

    1. Asphalt mix for paving: enter length, width, thickness, mix density and bitumen content to get bitumen, aggregate and mix weight.
    2. Spray rate for tack, prime and seal coats: find the binder you need, or check the rate you actually applied.
    3. Drums & litres to convert between kilograms, tonnes, litres, gallons and drums.
    4. Open Show the working to see every step, then copy, print or share the result.

    Main formula

    Bitumen (kg) = Length (m) × Width (m) × Thickness (m) × Mix density (kg/m³) × Bitumen % ÷ 100

    Use your approved mix design for density and bitumen content. The mix type presets are typical figures for planning.

    Worked example: bitumen for a two-lane road

    A road section is 800 m long and 7 m wide, with a 40 mm wearing course. The mix density is 2,350 kg/m³ and the bitumen content is 5.5%.

    1. Volume = 800 m × 7 m × 0.04 m = 224 m³
    2. Mix weight = 224 m³ × 2,350 kg/m³ = 526,400 kg = 526.4 tonnes
    3. Bitumen = 526,400 kg × 5.5% = 28,952 kg = 28.95 tonnes
    4. Aggregate = 526.4 − 28.95 = 497.45 tonnes

    Thickness is converted to metres first (40 mm is 0.04 m). The calculator does the same for feet, yards, centimetres, inches and pounds per cubic foot. These are the values loaded when the page opens, so you can compare them with the result above.

    Bitumen formulas

    These are the formulas the calculator uses. All lengths are in metres and all weights in kilograms unless stated.

    What you wantFormulaNotes
    Mix volumeV = L × W × TGives cubic metres (m³).
    Mix weightW = V × ρρ is the compacted mix density, usually 2,300 to 2,450 kg/m³.
    Bitumen weightWb = W × B% ÷ 100B% is the bitumen content by weight of mix.
    Bitumen contentB% = Wb ÷ W × 100Use this when you know both weights.
    Spray quantityQ = Area × Rate × (1 + Waste% ÷ 100)Rate is in kg/m² or L/m².
    Litres from kilogramsL = kg ÷ densityBitumen is about 1.03 kg/L.

    How much bitumen is in asphalt?

    Hot mix asphalt is usually 4 to 7% bitumen by weight. The rest is crushed aggregate, sand and filler. At 5.5%, one tonne of mix holds 55 kg of bitumen. Too little binder can lead to cracking and loose surface stones, and too much can lead to bleeding and rutting, so the final figure comes from your mix design.

    Typical bitumen content by mix type

    Mix typeBitumen contentTypical use
    Wearing course, dense graded5.0 to 6.0%Surface layer of most roads
    Binder course4.5 to 5.2%Layer under the wearing course
    Base course3.8 to 4.8%Structural layer on the road base
    Stone mastic asphalt (SMA)5.8 to 7.0%Heavy traffic roads
    Open graded friction course4.5 to 6.0%Drainage and low noise surfaces

    These are typical planning ranges. Aggregate type, grading, traffic and climate all change the figure, so use the value from your Marshall or Superpave mix design.

    Bitumen per tonne of mix

    Bitumen contentBitumen in 1 tonne of mixMix made from 1 tonne of bitumen
    4.0%40 kg25.0 t
    4.5%45 kg22.2 t
    5.0%50 kg20.0 t
    5.5%55 kg18.2 t
    6.0%60 kg16.7 t
    6.5%65 kg15.4 t
    7.0%70 kg14.3 t

    Bitumen needed for 1 km of road

    These figures use a mix density of 2,350 kg/m³, 5.5% bitumen and a drum net weight of 180 kg. Change the inputs in the calculator above to match your own project.

    Section (1 km long)Mix (tonnes)Bitumen at 5.5% (tonnes)Drums at 180 kg
    3.5 m wide, 40 mm thick (one lane)329.018.10101
    3.5 m wide, 50 mm thick (one lane)411.322.62126
    7 m wide, 40 mm thick (two lanes)658.036.19201
    7 m wide, 50 mm thick (two lanes)822.545.24251
    7 m wide, 60 mm thick (two lanes)987.054.29302

    Spray rate for tack, prime and seal coats

    Spray rates are given in litres or kilograms per square metre. Multiply the treated area by the rate and add a waste allowance. For 5,000 m² at 0.35 L/m² with 5% waste you need 1,837.5 litres, which is about 1,893 kg at 1.03 kg/L.

    TreatmentTypical rateBinder
    Tack coat0.25 to 0.50 L/m²Bitumen emulsion
    Prime coat0.70 to 1.40 L/m²Cutback bitumen or prime emulsion
    Seal coat or surface dressing0.90 to 1.60 L/m²Emulsion or hot bitumen binder

    Rates change with the surface texture and your specification. Use the spray rate calculator to check the rate you applied, or read the spray rate guide. To convert between kilograms and litres, see the bitumen density calculator.

    All calculator tools

    Explore every bitumen calculator on the site

    Each calculator below has its own page with the formula, a worked example and answers to common questions.

    Blog section

    Useful bitumen guides and planning articles

    Practical guides on estimating bitumen quantities, choosing spray rates and converting density, volume and weight.

    Bitumen calculator FAQ

    What is a bitumen calculator?

    A bitumen calculator estimates how much bitumen binder a job needs. For asphalt it multiplies the layer volume by the mix density and the bitumen content. For spraying it multiplies the treated area by the spray rate.

    How do I calculate bitumen quantity for asphalt?

    Multiply length, width and compacted thickness (all in metres) to get the volume. Multiply by the mix density to get the mix weight, then multiply by the bitumen percentage divided by 100. For 224 m³ at 2,350 kg/m³ and 5.5% bitumen, that gives 28.95 tonnes.

    How much bitumen is in one tonne of asphalt?

    At the usual 4.5 to 6.5% content, one tonne of asphalt holds about 45 to 65 kg of bitumen. At 5.5% it holds 55 kg.

    How much bitumen is needed for 1,000 square metres?

    It depends on the work. Spraying at 1.2 kg/m² needs 1,200 kg. Paving a 40 mm layer at 2,350 kg/m³ and 5.5% bitumen needs about 5.17 tonnes.

    What is the formula for bitumen content percentage?

    Bitumen content (%) = weight of bitumen ÷ total mix weight × 100. For example, 22.6 tonnes of bitumen in 411 tonnes of mix is 5.5%.

    What is the difference between bitumen and asphalt?

    Bitumen is the black, sticky binder made from crude oil. Asphalt is the paving material made by mixing bitumen with aggregate such as crushed stone, sand and filler.

    How many drums make a tonne of bitumen?

    With a net weight of 180 kg per drum, one tonne is about 5.6 drums. Drum weights vary by supplier, so enter your own figure in the Drums & litres tab.

    What mix density should I use?

    Compacted dense asphalt is typically 2,300 to 2,450 kg/m³. Use the density from your mix design or core tests when you have it.

    Which calculator tab should I start with?

    Use Asphalt mix for paving layers, Spray rate for tack, prime and seal coats, and Drums & litres for conversions. The other calculators on this site cover volume, density, roofing and optimum bitumen content.

    Are the results exact?

    They are planning estimates based on the values you enter. Final orders should follow your approved mix design, product specifications and site conditions.

    Can I use the calculator on a phone?

    Yes. It is built for phones, tablets and desktops, so you can use it on site.

    Need more project detail?

    Visit the dedicated calculator pages for volume, density, spray rate, roofing quantities, and optimum bitumen content.